...
首页> 外文期刊>Landslides >The formation and development of debris flows in large watersheds after the 2008 Wenchuan Earthquake
【24h】

The formation and development of debris flows in large watersheds after the 2008 Wenchuan Earthquake

机译:2008年汶川地震后大流域泥石流的形成与发展

获取原文
获取原文并翻译 | 示例
           

摘要

The Wenchuan earthquake has caused abundance of loose materials supplies for debris flows. Many debris flows have occurred in watersheds in area beyond 20 km(2), presenting characteristics differing from those in small watersheds. The debris flows yearly frequency decreases exponentially, and the average debris flow magnitude increases linearly with watershed size. The rainfall thresholds for debris flows in large watersheds were expressed as I = 14.7 D (-0.79) (2 h < D < 56 h), which is considerably higher than those in small watersheds as I = 4.4 D (-0.70) (2 h < D < 37 h). A case study is conducted in Ergou, 39.4 km(2) in area, to illustrate the formation and development processes of debris flows in large watersheds. A debris flow develops in a large watershed only when the rainfall was high enough to trigger the wide-spread failures and erosions on slope and realize the confluence in the watershed. The debris flow was supplied by the widely distributed failures dominated by rill erosions (14 in 22 sources in this case). The intermittent supplying increased the size and duration of debris flow. While the landslide dam failures provided most amounts for debris flows (57 % of the total amount), and amplified the discharge suddenly. During these processes, the debris flow velocity and density increased as well. The similar processes were observed in other large watersheds, indicating this case is representative.
机译:汶川地震造成了泥石流的大量散料供应。在超过20 km(2)的流域中发生了许多泥石流,其特征不同于小流域。泥石流的年频率呈指数下降,平均泥石流的大小随流域的大小呈线性增加。大流域的泥石流降雨阈值表示为I = 14.7 D(-0.79)(2 h

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号