...
首页> 外文期刊>Land Economics >Assessing the short-run economic cost of environmental constraints on hydropower operations at glen canyon dam
【24h】

Assessing the short-run economic cost of environmental constraints on hydropower operations at glen canyon dam

机译:评估格伦峡谷大坝水电运营环境约束的短期经济成本

获取原文
获取原文并翻译 | 示例

摘要

Environmental externalities resulting from the construction and operation of a number of hydropower plants are now being reexamined. The focus of many recent analyses is on identifying new, often more restrictive, operational regimes which will improve downstream environmental conditions. These new regimes may create significant market and nonmarket benefits but constraints on hydropower operations frequently lead to economic costs. This paper introduces an hourly constrained optimization framework for estimating the short-run costs of restricting hydropower operations. Glen Canyon Dam, on the Colorado River in Arizona, is used as a case study. Newly available marketbased prices are employed.
机译:目前正在重新审查由于许多水力发电厂的建设和运营而造成的环境外部性。许多近期分析的重点是确定新的,通常更具限制性的运行制度,以改善下游环境条件。这些新制度可能会产生重大的市场和非市场利益,但水电运营的限制往往会导致经济损失。本文介绍了一个小时约束优化框架,用于估算限制水电​​运营的短期成本。以亚利桑那州科罗拉多河上的格伦峡谷大坝为例。采用新的市场价格。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号