首页> 外文期刊>nitrogen + syngas >Lessons learned from ammonia industry incidents
【24h】

Lessons learned from ammonia industry incidents

机译:从氨行业事故中学到的教训

获取原文
获取原文并翻译 | 示例
       

摘要

Ammonia plant no. 1 (USA) was built by MW Kellogg and commissioned in 1968 with a nameplate capacity of 907 t/d and has been modified in several stages to its current capacity of over 1,361 t/d. The facility had a routine turnaround planned for the summer of 2014 to perform scheduled maintenance, conduct required inspections, and replace catalysts. During this shutdown, the plant replaced catalysts in the desulphurisation system, high temperature shift (HTS) reactor and low temperature shift (LTS) main reactor. The LTS catalyst required a reduction step before being placed into service. The plant did not replace the catalyst in the primary reformer, which had been in service for three years.
机译:氨厂号1(美国)由MW Kellogg建造,于1968年投入生产,铭牌容量为907 t / d,经过几个阶段的修改,使其目前的容量超过1,361 t / d。该工厂计划在2014年夏季进行例行维修,以执行计划的维护,进行必要的检查并更换催化剂。在停机期间,该工厂更换了脱硫系统,高温变换(HTS)反应器和低温变换(LTS)主反应器中的催化剂。 LTS催化剂在投入使用之前需要还原步骤。该设备没有替代已使用三年的一级重整器中的催化剂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号