...
首页> 外文期刊>nitrogen + syngas >Air Products gets go-ahead for waste gasification plant
【24h】

Air Products gets go-ahead for waste gasification plant

机译:空气化工产品有限公司进入废物气化厂

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Air Products has been given a green light to build the 49MW Tees Valley Renewable Energy Facility. The company has confirmed that it has secured planning permission from Stockton-on-Tees Borough Council to build the plant, which is expected to be the UK's first large-scale facility to generate electricity from gasification of municipal waste. The company is still awaiting consent from the UK Environment Agency, but is hoping to begin work on the site next year, with commercial operations starting in 2014.
机译:空气产品公司已获准建造49兆瓦的蒂斯谷可再生能源工厂。该公司已确认已获得蒂斯河畔斯托克顿自治市议会的规划许可,以建设该工厂。该工厂有望成为英国首个利用城市垃圾气化发电的大型工厂。该公司仍在等待英国环境署的同意,但希望明年在该地点开始工作,并于2014年开始商业运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号