...
首页> 外文期刊>Manufacturing Business Technology >CASE-IN-POINT: Boeing 787 program flying smoothly with Exostar collaboration engine
【24h】

CASE-IN-POINT: Boeing 787 program flying smoothly with Exostar collaboration engine

机译:案例分析:借助Exostar协作引擎,波音787计划顺利运行

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In preparation for delivering its next-generation commercial aircraft - the 787 Dreamliner - Boeing adopted a new business model. For the first time in its history, the Chicago-based aircraft manufacture'' is asking supply chain partners to build large portions of an aircraft rather than simply supplying parts. The partners will deliver full sections of the 737 to Boeing's primary production facility in Everett, Wash., where the final aircraft will be assembled and tested.
机译:为准备交付其下一代商用飞机787 Dreamliner,波音公司采用了一种新的商业模式。总部位于芝加哥的飞机制造商有史以来第一次要求供应链合作伙伴制造飞机的大部分,而不是简单地提供零件。合作伙伴将把波音737的全部部件交付给位于华盛顿州埃弗里特的波音公司的主要生产工厂,在那里将组装和测试最终飞机。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号