...
首页> 外文期刊>North American Journal of Fisheries Management >Movements of Prespawn Adult Atlantic Salmon Near Hydroelectric Dams in the Lower Penobscot River, Maine
【24h】

Movements of Prespawn Adult Atlantic Salmon Near Hydroelectric Dams in the Lower Penobscot River, Maine

机译:缅因州下彭诺斯科特河下游水电大坝附近的产前成年大西洋鲑鱼的运动

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Acoustic telemetry was used to assess riverine behavior and passage success for prespawn male adult Atlantic salmon Salmo salar in the lower Penobscot River, Maine, in 2005 (n = 10) and 2006 (n = 25). Only 3 of 10 (30%) and 2 of 25 (8%) tagged Atlantic salmon successfully passed all three dams between the head of tide and presumed spawning habitat in 2005 and 2006, respectively. Migrants that failed to pass the second upstream dam frequently fell back into the estuary (3 of 4 in 2005; 17 of 23 in 2006), and few successfully reascended Veazie Dam at the head of tide. Fallback behavior was associated with temperatures exceeding 22 degree C and may reflect a strategy for coping with thermal stress and migratory delays. Atlantic salmon were also observed to actively seek out thermal refuge near one of the dams. Passage data were compared with results from previous telemetry studies that used Carlin tags and radio telemetry from 1987-1990 and 1992, and passive integrated transponder tags from 2002-2004. For all 10 years of study combined, median passage success was 64, 72, and 93% for the three dams. While 2006 may represent an uncommonly poor year for upstream passage at these dams, median cumulative passage past two of these dams was only 71% and ranged from 8% to 87% among years. Study results indicate that poor upstream passage severely limits migratory success in this system, particularly during periods of high discharge. Planned removal of two of these lower river dams is expected to improve migratory success for adult Atlantic salmon in the Penobscot River system.
机译:2005年(n = 10)和2006年(n = 25)使用声遥测技术评估缅因州Penobscot河下游产卵的成年雄性成年大西洋鲑Salmo salar的河流行为和通过成功。在2005年和2006年,分别贴有标签的大西洋鲑鱼中,只有10个中的3个(30%)和25个中的2个(8%)成功通过了潮汐头和假定产卵栖息地之间的所有三个水坝。未能通过上游第二座大坝的移民经常落入河口(2005年为4人中的3人; 2006年为23人中的17人),很少有人成功地将Veazie大坝登上了潮头。后备行为与温度超过22摄氏度有关,并且可能反映了应对热应激和迁徙延迟的策略。还观察到大西洋鲑鱼积极寻找其中一个水坝附近的避难所。将通行数据与以前的遥测研究结果进行了比较,该研究使用了1987-1990年和1992年的Carlin标签和无线电遥测技术以及2002-2004年的无源集成应答器标签。在所有10年的研究中,三个大坝的平均通过成功率分别为64%,72%和93%。尽管2006年可能是这些大坝上游过水的不寻常年份,但经过这两个大坝的平均累计过水量中位数仅为71%,多年间从8%到87%不等。研究结果表明,差的上游通道严重限制了该系统的迁徙成功,特别是在高排放期间。计划拆除这两个下游河水坝有望改善Penobscot河系统中成年大西洋鲑鱼的迁徙成功。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号