首页> 外文期刊>New Steel Construction >M53 Bidston Moss Viaduct Strengthening
【24h】

M53 Bidston Moss Viaduct Strengthening

机译:M53 Bidston Moss高架桥加固

获取原文
获取原文并翻译 | 示例
       

摘要

Fully restoring a vital road link and undertaking extensive weiding inside confined spaces, with minimal disruption to traffic, were all safely achieved on this bridge project.The 730m long Bidston Moss Viaduct is a multi span box girder structure that connects the M53 to the River Mersey's Kingsway Tunnel, carrying 63,000 vehicles a day on this strategic route into Liverpool.A recently completed strengthening programme has now fully restored the structure, allowing load restrictions (HGVs were not allowed on the outside lanes) which had been imposed during the last ten years to be lifted.
机译:这座桥梁工程安全地实现了至关重要的道路连接的完全恢复,并在密闭空间内进行了广泛的焊接,对交通的影响最小。730米长的Bidston Moss高架桥是一个多跨箱形箱梁结构,将M53连接到默西河金斯威隧道(Kingsway Tunnel)在通往利物浦的这一战略路线上每天运送63,000辆车。最近完成的加固计划现已完全恢复了结构,从而允许在过去十年中施加负荷限制(禁止在外面的车道使用HGV)被解除。

著录项

  • 来源
    《New Steel Construction》 |2012年第7期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 金属结构;
  • 关键词

  • 入库时间 2022-08-18 12:34:33

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号