Meta-synthesis pattern of post-disaster recovery and reconstruction: based on actual investigation on 2008 Wenchuan earthquake

机译:灾后恢复与重建的元合成模式:基于2008年汶川地震的实际调查

获取原文
获取原文并翻译 | 示例
           

摘要

A devastating Ms8.0 earthquake struck Wenchuan on May 12, 2008, a historical county in Sichuan Province, southwest China, which affected more than half of China. This article makes a comparative study on the pre-earthquake prevention and post-earthquake reconstruction of 14 world-famous earthquakes in the last 100 years, generalizes the various problems in the process of recovery and reconstruction and analyzes the reasons for the enormous damage caused by these earthquakes. Through theoretical research and field investigation on post-Wenchuan earthquake recovery and reconstruction, the meta-synthesis pattern has been summarized and developed. Its ideological foundation is meta-synthesis methodology, concrete expression is Wuli-Shili-Renli three-dimensional approach, and practical realization using an integrated framework. Taking post-earthquake recovery and reconstruction as a complicated systematic project, from the vertical perspective, the whole process can be roughly divided into the phases of transitional recovery and comprehensive reconstruction. While from the horizontal perspective, each phase should have its own support systems. From an investigation of the systematic planning and comprehensive implementation, it can be concluded that post-Wenchuan earthquake recovery and reconstruction has made remarkable achievements over the past 3 years. Since disasters continue to threaten humanity around the world, especially climate-induced extreme weather events, other countries could formulate applicable integrated programs for post-disaster recovery and reconstruction, taking the Wenchuan experience as a reference.
机译:2008年5月12日,汶川发生了毁灭性的Ms8.0地震,汶川是中国西南部四川省的一座历史名县,受灾地区超过一半。本文对近百年来14次世界著名地震的震前预防和震后重建进行了比较研究,归纳了灾后恢复重建过程中的各种问题,并分析了造成震害巨大的原因。这些地震。通过对汶川地震后恢复重建的理论研究和实地调查,总结并建立了元合成模式。它的思想基础是元综合方法论,具体的表达方式是五里-十里-仁里三维方法,并使用集成框架进行实际实现。从震后恢复和重建作为一个复杂的系统工程,从垂直角度看,整个过程可以大致分为过渡恢复和全面重建两个阶段。从水平角度看,每个阶段都应该有自己的支持系统。通过对系统规划和综合实施的调查,可以得出结论,汶川地震后的重建和重建在过去三年中取得了令人瞩目的成就。由于灾难继续威胁着世界各地的人类,尤其是气候引起的极端天气事件,因此其他国家可以制定适当的灾后恢复和重建综合方案,并借鉴汶川的经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号