首页> 外文期刊>MM Industrial Magazine Western Europe >Making good things better: The new 190-MW-Gas turbine V94.2A of Siemens/KWU closes a gap in supply
【24h】

Making good things better: The new 190-MW-Gas turbine V94.2A of Siemens/KWU closes a gap in supply

机译:使事情变得更好:西门子/ KWU的新型190兆瓦燃气轮机V94.2A弥补了供应缺口

获取原文
获取原文并翻译 | 示例
       

摘要

Combined gas- and vapour turbine- (GAV) power stations have won a big market share since the 1 980s. A prerequisite for this was the development of high-capacity, robust and long-life gas turbines (GT). Siemens/KWU has invested more than 8 million hours of GT operating experience in the development of the new 190-MW-gas turbine V94.2A. Great importance was attached to an optimum combination of the factors high efficiency, reliability, long life-time, favourable operation flexibility, minor servicerequirement and low NO{sub}x-emission. It was deliberately renounced to take advantage of all efficiency- and capacity potentials in favour of operational reliability and availability.
机译:自1 980年代以来,燃气轮机和蒸汽轮机(GAV)组合发电站赢得了巨大的市场份额。为此的先决条件是开发大容量,坚固耐用且寿命长的燃气轮机(GT)。西门子/ KWU在研发新型190兆瓦燃气轮机V94.2A方面已投资了800万小时以上的GT运营经验。效率,可靠性,使用寿命长,良好的操作灵活性,较少的服务要求和低NOx排放等因素的最佳组合受到了高度重视。故意放弃使用所有效率和容量潜力来支持操作可靠性和可用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号