首页> 外文期刊>Model Engineer >Building a vertical steam-driven boiler feed pump: Ted Holloway machines a Southworth 6in. Donkey Pump. PART 3
【24h】

Building a vertical steam-driven boiler feed pump: Ted Holloway machines a Southworth 6in. Donkey Pump. PART 3

机译:构建立式蒸汽驱动锅炉给水泵:Ted Holloway加工Southworth 6in。驴泵。第三部分

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

For drawings see M.E. 4370, 29 January 2010. If you haven't got a tapping and staking tool, an alternative is to use the drilling machine. Without moving the workpiece, remove the drill bit and put a 'second cut' ME1/4in. ×40 tap into the chuck. Release the drive belt so that the chuck rotates freely. It might also be an idea to unplug the machine. I have made up a set of capstan bars (photo 13) which enable me to use the drill chuck in the manner described as an accurate and square tapping tool. This reduces the risk of misalignment and tap breakage, I suggest you do the same; it could save you both time and temper.
机译:有关图纸,请参见2010年1月29日的M.E.4370。如果您没有攻丝和放样工具,则可以选择使用钻孔机。在不移动工件的情况下,卸下钻头,然后放上“第二个切口” ME1 / 4in。 ×40轻敲卡盘。松开传动带,使卡盘自由旋转。拔掉机器的电源也可能是一个主意。我已经制作了一组主导轴杆(照片13),使我能够以描述为一种精确的方形攻丝工具的方式使用钻夹头。这样可以减少未对准和丝锥断裂的风险,我建议您也这样做;它可以节省您的时间和精力。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号