首页> 外文期刊>Mining Journal >Placer's record
【24h】

Placer's record

机译:配售记录

获取原文
获取原文并翻译 | 示例
           

摘要

Vancouver-based Placer Dome has reported a record beneficial gold production of 535,272 oz for the quarter to end-September (408,000 oz previously), bringing its nine month output to 1.36 Moz - 5 percent higher than in the equivalent period of 1994. As a result of this improvement, and reduced operating costs, third quarter net earnings rose to 24 million US dollars, compared with 18 million dollars in 1994. The year to date figure of 36 million dollars, however, was less than half of the 79 million dollars recorded at the equivalent stage of 1994. This shortfall is attributed to increased exploration expenditure and a 17 million dollars write-off of a non-core investment. Placer Dome's third quarter average cash production cost of 201 dollars/oz continues the downward trend of the second quarter now that certain mine operating problems have been overcome, ore grades have improved and new production from the Dome mine in Canada has come on stream. However, costs are still, above the 196 dollars/oz achieved in the third quarter of 1994.
机译:总部位于温哥华的Placer Dome报告称,截至9月底的季度中,有益的黄金产量达到创纪录的535,272盎司(之前为408,000盎司),使其9个月的产量达到1.36 Moz,比1994年同期增长5%。得益于这种改善,并降低了运营成本,第三季度的净收益从1994年的1800万美元增至2400万美元。然而,迄今为止的数字为3600万美元,还不到7900万美元的一半。记录是在1994年同一时期记录的。这一短缺归因于勘探支出的增加和非核心投资的1,700万美元的冲销。由于克服了某些矿山的运营问题,矿石品位提高,加拿大Dome矿的新生产投产,Placer Dome第三季度的平均现金生产成本为201美元/盎司,延续了第二季度的下降趋势。然而,成本仍然高于1994年第三季度的196美元/盎司。

著录项

  • 来源
    《Mining Journal》 |1995年第8351期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿山开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号