An application by Taylors Transport Ltd to extend the existing limestone quarry at Worsham near Asthall was refused by Oxfordshire CC in July. The existing quarry lies within the Cotswolds AONB. The proposed extension comprised 3.5 ha of agricultural land to the west of the existing quarry which covers 8 ha. The permitted depth of the quarry (limited by means of a legal agreement in December 2000) is 107m AOD. It was proposed to extract limestone to provide aggregates and some block stone (20 percent of the total). If extracted to 107m AOD there is about 300,000t of saleable reserve remaining in the quarry. The extension area would yield about 750,000t of limestone. However, the applicant subsequently revised the working scheme to quarry to 110m AOD; the reserve would be reduced to 275,000 of saleable reserve in the existing quarry and reserves in the extension area would be 600,000t. The quarry could be worked out in 5-6 years (2008). The restoration using existing quarry waste and imported waste would take 13 years and should be completed by 2015.
机译:泰勒运输有限公司(Taylors Transport Ltd)提出的在Asthall附近的Worsham扩建现有石灰石采石场的申请被牛津郡CC拒绝。现有的采石场位于科茨沃尔德AONB内。拟议的扩展包括在现有采石场以西3.5公顷的农业用地,占地8公顷。采石场的允许深度(根据2000年12月的法律协议加以限制)为AOD 107m。建议提取石灰石以提供集料和一些块石(占总量的20%)。如果将其提取到AOD为1.07亿,则该矿场中还有约30万吨可售储量。扩展区将产生约75万吨石灰石。但是,申请人随后修改了采石场的工作计划,将日采石量定为1.1亿日圆。现有的采石场的储量将减少到275,000的可售储量,而扩展区的储量将为60万吨。采石场可以在5-6年(2008年)内完成。使用现有采石场废物和进口废物进行的修复将需要13年,并应在2015年完成。

著录项

  • 来源
    《Mineral Planning》 |2002年第92期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号