A proposal by Hanson Aggregates to extract some 80,000t of sand from an extension to the south east of Town Farm Quarry, Norley, from a 1.6 ha site which included the installation of a new haul road north of a Ministry of Defence pipeline to allow 190,000t of permitted sand reserves to be extracted, was approved by Cheshire CC in May, subject to the Secretary of State not calling in the application. The sand was being blended from two working areas on the site to produce concreting sand but the area supplying coarser sand was nearing depletion. The haul road was needed to allow permitted reserves to be used from an existing part of the quarry which would otherwise remain sterile. The phased working of the quarry, including the relocation of the processing plant along with the restoration of the site would be revised and an extension of time to permit the extraction of sand to continue from March 2003 until March 2005 was also proposed. Although part of the site was outside the Area of Search for construction sand, the proposal would not cause demonstrable harm to the local environment or to the Green Belt. There were no objections from statutory consultees and only two letters of objection from nearby residents.
机译:汉森骨料公司的一项提议是从一个1.6公顷的场地的诺里镇农庄采石场东南延伸部分提取约80,000吨沙子,其中包括在国防部管道以北安装一条新的运输道路,以允许190,000 t允许开采的砂岩储量的吨数已由柴郡CC于5月批准,但国务卿未提出要求。砂从现场的两个工作区域混合以产生凝结的砂,但供应较粗砂的区域却快要枯竭了。需要使用运输道路,以允许从采石场的现有部分使用许可的储备,否则这些储备将保持无菌状态。采石场的分阶段工作,包括加工厂的搬迁以及场址的恢复,将得到修订,并且还提议延长允许沙粒开采的时间,从2003年3月到2005年3月。尽管该站点的一部分位于“搜寻建筑用沙区域”之外,但该提议不会对当地环境或绿化带造成明显损害。法定顾问没有异议,附近居民只有两封异议。

著录项

  • 来源
    《Mineral Planning》 |2002年第92期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号