...
首页> 外文期刊>Mining Journal >Sepon feasibility drilling
【24h】

Sepon feasibility drilling

机译:Sepon可行性钻探

获取原文
获取原文并翻译 | 示例

摘要

Oxiana Resources NL has received the first assays from a drilling programme being conducted as part of a feasibility study of the development of the Khanong copper deposit at the 80 percent-owned Sepon project in Laos (MJ, March 1, p.166). The in-fill and extension drilling is designed to upgrade resources from inferred, to measured and indicated categories, and to test extensions to the orebody. The better results are as follows:Hole Interval Cu (m) (%)KHN207 22-49 5.2KHN208 17-65 6.5KHN210 27-59 4.8KHN212 1-67 9.2incl. 42-67 21.9
机译:Oxiana Resources NL从老挝拥有80%股份的Sepon项目开发Khanong铜矿的可行性研究中,获得了一项钻井计划的第一批试验(MJ,3月1日,第166页)。填充和延伸钻探的目的是将资源从推断的,已测量的和指示的类别升级,并测试对矿体的延伸。更好的结果如下:孔间隔Cu(m)(%)KHN207 22-49 5.2KHN208 17-65 6.5KHN210 27-59 4.8KHN212 1-67 9.2incl。 42-67 21.9

著录项

  • 来源
    《Mining Journal 》 |2002年第8686期| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿山开采 ;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号