...
首页> 外文期刊>Mining Engineering >Production scheduling at LKAB's Kiruna Mine using mixed-integer programming
【24h】

Production scheduling at LKAB's Kiruna Mine using mixed-integer programming

机译:使用混合整数编程在LKAB的Kiruna矿进行生产调度

获取原文
获取原文并翻译 | 示例

摘要

LKAB's Kiruna Mine, located in northern Sweden, produces about 24 Mt/a (23.6 million ltpy) of iron ore using sublevel caving. For mill efficiency, the mine must deliver planned quantities of three ore products. Mixed-integer programming is used to schedule Kiruna's operations. Specifically, this involves determining which production blocks should be mined and when they should be mined to minimize deviations from planned production quantities while adhering to mining restrictions (e.g., sequencing). A new production-block database and a well-formulated mixed-integer programming model dramatically reduce the size of the original problem. In less than ten minutes, five-year schedules with time fidelity of months are generated.
机译:LKAB位于瑞典北部的基律纳煤矿通过分段开采产生了约24吨/年(2360万升/天)的铁矿石。为了提高工厂效率,矿山必须交付计划数量的三种矿石产品。混合整数编程用于调度Kiruna的操作。具体而言,这涉及确定应开采哪些生产区块以及何时开采它们,以在遵守开采限制(例如排序)的同时,最大程度地减少与计划生产量的偏差。一个新的生产块数据库和一个结构良好的混合整数编程模型极大地减少了原始问题的大小。在不到十分钟的时间内,生成了五年计划,时间保真度为几个月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号