...
首页> 外文期刊>Mining Engineering >Horizontal stress and longwall headgate ground control
【24h】

Horizontal stress and longwall headgate ground control

机译:水平应力和长壁闸门地面控制

获取原文
获取原文并翻译 | 示例
           

摘要

Horizontal stresses are caused by global plate-tectonic forces. During 1995 alone they were largely responsible for the closing of two longwall mines in the United States. This paper presents six case histories from Pennsylvania, West Virginia,Kentucky and Alabama. In each case, a mine encountered roof falls or difficult ground conditions at the headgate caused by horizontal-stress concentrations. The problems are detailed, and the control measures adopted are described. In most cases, nearbylongwall panels without stress concentrations were trouble free.The paper also discusses detailed measurements that were made at two adjacent Pennsylvania longwalls. One headgate was oriented to avoid a horizontal-stress concentration, and the other was not. Eliminating the stress concentration dramatically reducedroof support loads and roof deformation.The paper concludes that proper panel orientation and sequence is the key to maintaining headgate ground control. The optimum orientation is not parallel to the maximum horizontal stress, as previously thought, but rather it is 200 in the stress shadow of the gob. Other stress-control techniques, including artificial support, are briefly discussed.
机译:水平应力是由整体板块构造力引起的。仅在1995年,他们就在美国关闭了两个长壁矿井。本文介绍了宾夕法尼亚州,西弗吉尼亚州,肯塔基州和阿拉巴马州的六个案例历史。在每种情况下,矿井都遇到因水平应力集中而导致的车顶跌落或高架门处的困难地面条件。详细描述了问题,并描述了所采取的控制措施。在大多数情况下,附近没有应力集中的长壁板是没有问题的。本文还讨论了在两个相邻的宾夕法尼亚州长壁上进行的详细测量。一个高架门的方向避免了水平应力的集中,而另一个则没有。消除应力集中可显着减少屋顶支撑载荷和屋顶变形。本文得出结论,正确的面板方向和顺序是维持顶板地面控制的关键。最佳定向与先前所认为的不平行于最大水平应力,而是在料滴的应力阴影中为200。简要讨论了其他压力控制技术,包括人工支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号