首页> 外文期刊>Mineral Law Newsletter >ENVIRONMENTAL ISSUES
【24h】

ENVIRONMENTAL ISSUES

机译:环境问题

获取原文
获取原文并翻译 | 示例
           

摘要

Seventh Circuit Imposes Time Limitations on New Source Review Enforcement Actions Under the Clean Air Act On July 8, 2013, the U.S. Court of Appeals for the Seventh Circuit in United States v. Midwest Generation, LLC, 720 F.3d 644, (7th Cir. 2013), aff'g 694 F. Supp. 2d 999 (N.D. Ill. 2010), affirmed the lower court's decision finding that the United States and the State of Illinois had failed to timely prosecute their new source review (NSR) action against Midwest Generation for the alleged failure to obtain a prevention of significant deterioration (PSD) preconstruction permit under section 165 of the Clean Air Act (CAA), 42 U.S.C. para. 7475. The court found that the failure to obtain a PSD permit and install the required best available control technology (BACT) was not a continuing violation and therefore the applicable statute of limitations had expired.
机译:第七巡回法院根据《清洁空气法》对新资源审查执法行动施加时间限制。2013年7月8日,美国第七巡回上诉法院在美国诉Midwest Generation,LLC,720 F.3d644(第7 (2013年),ff'g 694 F. Supp。 2d 999(ND Ill。2010)确认了下级法院的裁决,裁定美国和伊利诺伊州未能及时起诉其针对Midwest Generation的新来源审查(NSR)诉讼,原因是据称未能获得重大预防。 42 USC的《清洁空气法》(CAA)第165条规定的劣化(PSD)预制施工许可证段7475.法院认为,未能获得PSD许可和安装所需的最佳可用控制技术并不是持续的违反行为,因此适用的时效法规已过期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号