首页> 外文期刊>Gold & Minerals Gazette >Exterra focused on production in 2012
【24h】

Exterra focused on production in 2012

机译:Exterra在2012年专注于生产

获取原文
获取原文并翻译 | 示例
           

摘要

Exterra is looking to bring its Zelica gold project, which currently has a JORC measured and inferred resource of 1.2 million tonnes at 2.22 grams/tonne Au, into production in 2012. This should provide early cash flow to fund acquisitions and further development of the company's interests in the region. Managing director John Davis said further drilling was imperative to bring the mine into production.
机译:Exterra希望在2012年将其Zelica黄金项目投入生产,该项目目前拥有JORC测得的推断资源量为120万吨(2.22克/吨金)。该地区的利益。常务董事约翰·戴维斯(John Davis)表示,必须进行进一步钻探才能使该矿投入生产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号