首页> 外文期刊>Gold & Minerals Gazette >Major downstream processing project arrives
【24h】

Major downstream processing project arrives

机译:重大下游加工项目到货

获取原文
获取原文并翻译 | 示例
       

摘要

HIsmelt joint venture partner and US steelmaker Nucor Corporation (25 percent) has taken the first shipment of pig iron from Rio Tinto Ltd's (60 percent) new commercial-scale HIsmelt plant in Kwinana, Western Australia, which began continuous production of molten iron from its smelt reduction vessel last month. The plant has been progressively commissioned since construction was completed in April and has moved into a ramp-up phase. Under the JV, which includes Japanese trading house Mitsubishi Corporation (10 percent) and Chinese steelmaker Shougang Corporation (5 percent), the plant is operated by Rio Tinto subsidiary HIsmelt (Operations) Pty Ltd with 70 full-time employees.
机译:HIsmelt的合资伙伴和美国钢铁制造商Nucor Corporation(25%)已从力拓(Rio Tinto Ltd)(60%)在西澳大利亚州凯维纳(Kwinana)新建的商业规模的HIsmelt工厂中装运了第一批生铁,该工厂开始从其连续生产铁水上个月冶炼还原船。该工厂自4月完工以来已逐步调试,现已进入升级阶段。在合资企业中,该厂由力拓子公司HIsmelt(Operations)Pty Ltd经营,该公司拥有日本贸易公司三菱公司(10%)和中国钢铁制造商首钢公司(5%),该工厂拥有70名全职员工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号