首页> 外文期刊>Metallurgical Plant and Technology International >Wuhan Iron & Steel starts up process optimization system
【24h】

Wuhan Iron & Steel starts up process optimization system

机译:武钢启动流程优化系统

获取原文
获取原文并翻译 | 示例
       

摘要

The automation division of Voest-Alpine Industrieanlagenbau (VAI) successfully started up the process optimization system for the 4-strand sintering plant No. 1 in the metallurgical works at Wuhan Iron & Steel Corp.The contract, which was awarded to VAI Automation in September 2000, was implemented in a period of only 7 months. The final acceptance certificate was issued in August 2001.The order comprised advanced process models for the control of sinter quality and productivity as well as training and technical services.
机译:Voest-Alpine Industrieanlagenbau(VAI)的自动化部门成功启动了武汉钢铁公司冶金厂一号四线烧结厂的工艺优化系统。该合同已于9月授予VAI Automation 2000年实施仅用了7个月的时间。最终验收证书于2001年8月发布。该订单包括用于控制烧结矿质量和生产率以及培训和技术服务的先进工艺模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号