Modernization of Rasselstein's 6-stand tandem mill with a downtime of just 17 days

机译:Rasselstein的六机架串联轧机进行现代化改造,停机时间仅为17天

获取原文
获取原文并翻译 | 示例
           

摘要

Realtime simulation of the behaviour of plants, including their production processes, allow substantial cost savings, as well as strongly reduced risks and time requirements when building, modernizing and commissioning industrial plants.In this way, just 12 months of engineering and 2 months of simulation and testing were needed to modernize Rasselstein's 6-stand tandem mill. After a downtime of only 17 days the tandem mill went back into operation with the completely renewed automationand control system.Full production was achieved in 5 weeks. The thickness deviation was, in almost all cases, less than 0.6% whilst this value had still been in the order of 1.2% prior to modernization.
机译:实时模拟工厂的行为,包括其生产过程,可以节省大量成本,并大大减少了对工业工厂进行建造,现代化和调试时的风险和时间要求,因此仅需12个月的工程设计和2个月的仿真需要进行测试以使Rasselstein的6机架串联轧机现代化。在仅停产17天后,串联轧机通过完全更新的自动化和控制系统重新投入运行。5周内就实现了全部生产。在几乎所有情况下,厚度偏差均小于0.6%,而在现代化之前,该值仍约为1.2%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号