When Brent Schipper, AIA, LEED AF) principal of ASK Studio, Des Moines, took on the project, he not only needed to bring the design talent, but also a pace of design and construction that was astounding. From first design meeting to the end of construction, the entire project took a mere six months. Under that time constraint and with a 700,000 dolars construction budget, a metal building became an excellent solution. "One of the fun things," says Schipper, "was showing the owner what more a metal building could be." Star Building Systems, Oklahoma City, supplied the building, roof and wall panels.
展开▼
机译:当ASK工作室Des Moines的负责人AIA的Brent Schipper接手该项目时,他不仅需要带来设计人才,而且还需要惊人的设计和建造速度。从第一次设计会议到施工结束,整个项目仅用了六个月的时间。在那个时间限制下,加上70万美元的建造预算,金属建筑成为了一个很好的解决方案。席珀说:“有趣的事情之一是向业主展示了金属建筑的意义。”俄克拉荷马城的Star Building Systems提供了建筑物,屋顶和墙板。
展开▼