...
首页> 外文期刊>Metal Architecture >Scheduling trouble leads to utilization of ACM for building's extensive sunshades
【24h】

Scheduling trouble leads to utilization of ACM for building's extensive sunshades

机译:调度故障导致将ACM用于建筑物的宽阔遮阳棚

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

When executives at engineering and construction giant Fluor Corp. decided last year to build a new global corporate headquarters in Irving, TX, meeting the deadline was of the utmost importance. Design plans for the 140,000 sq. ft., three-story, dual-wing corporate building were begun in mid-June 2005, with groundbreaking in late July. Just eight months later, construction was completed. Similar projects, according to Fluor, usually require a 16-month timeline to complete. Contributing to this impressive construction timeline was the selection of Alucobond aluminum composite material (ACM) by Alcan Composites USA for a brand-new application-custom sunscreen louvers. Not only were these energy-saving louvers designed, fabricated and delivered for installation in a timely fashion, they contributed to this project's submission for certification by the U.S. Green Building Council's Leadership in Energy and Environmental Design (LEED) green building rating system.
机译:当工程和建筑业巨头福陆公司(Fluor Corp.)的高管去年决定在德克萨斯州欧文建立新的全球公司总部时,至关重要的是要按时完成任务。 140,000平方英尺的三层双翼公司大楼的设计计划于2005年6月中旬开始,并于7月下旬动工。仅八个月后,建设便告完成。据福陆说,类似的项目通常需要16个月的时间表才能完成。 Alcan Composites USA选择Alucobond铝复合材料(ACM)作为全新的应用定制防晒百叶窗,为这一令人印象深刻的施工时间表做出了贡献。这些节能百叶窗不仅得到及时设计,制造和交付安装,而且还为该项目提交了美国绿色建筑委员会能源与环境设计领导力(LEED)绿色建筑评级系统的认证做出了贡献。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号