FEATURES OF A CLASS III BLAST-FURNACE REPAIR

机译:III级高炉维修的特点

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

All of the liquid pig iron needed by the West Siberian Metallurgical Combine is currently supplied by two blast furnaces. Thus, any lengthy stoppage of either furnace would result in sizable production losses. Blast furnace No. 3, with a useful volume of 3000 m~3, began its present period of operation on Dec. 23, 1998 after a class I overhaul. During this time, the furnace has smelted more than 11.5 million tons of pig iron and has undergone three class III repairs. Neither the refractory lining nor the internal structures of the furnace have yet been repaired. During the three class III repairs - carried out in 2000, 2002, and 2003 - the combine replaced defective sections of the shell near iron notch No. 3 and installed six inserts with a total area of about 14 m . The combine also repaired two sections near the second course of refractory blocks in the shaft and installed inserts with a total area of about 1.5 m~2. Finally, it repaired a section near the knuckle (at about the 10.500-m elevation) on the skip side of the furnace. In this case, inserts with a total area of about 3 m were installed.
机译:西西伯利亚冶金联合工厂所需的所有液态生铁目前由两个高炉提供。因此,任何一个炉子的任何长时间的停止都会导致相当大的生产损失。 I级大修后,有效容积为3000 m〜3的3号高炉于1998年12月23日开始目前的运行。在此期间,该熔炉冶炼了超过1150万吨的生铁,并进行了三次III级维修。耐火炉衬和炉子的内部结构尚未修复。在2000年,2002年和2003年进行的三次III级维修期间,联合收割机替换了3号铁槽口附近的外壳缺陷部分,并安装了六个镶刀,总面积约为14 m。该联合收割机还在竖井中第二道耐火砖附近修复了两个部分,并安装了总面积约为1.5 m〜2的刀片。最后,它修复了炉the侧的转向节附近的部分(海拔约10.500-m)。在这种情况下,将安装总面积约为3 m的刀片。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号