首页> 外文期刊>Metallurgist >STATUS AND PROSPECTS FOR THE GROWTH OF SINTER PRODUCTION
【24h】

STATUS AND PROSPECTS FOR THE GROWTH OF SINTER PRODUCTION

机译:烧结矿生产的现状和前景

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The sinter-lime division of the West Siberian Metallurgical Combine (ZSMK) includes a crushing-sorting plant, sinter plant, pumping/sludge-handling facilities, and a limestone-calcining shop. The crushing-sorting plant is designed to receive, average, and deliver charge materials to the calcining shop, sinter plant, and blast furnaces. The first stage of the crushing-sorting plant came on line in June 1964. The plant includes two VRS-93 car-dumpers, a materials distribution building (MDB), three enclosed concentrate ware-houses with a design capacity of 97000 m each, two open storage areas with design capacities of 40000 m and 10000 m , a conveyor system with two units that mix the concentrate with lime, and receiving hoppers for fuel and scale. The open storage areas are for limestone and blast-furnace charge materials, respectively (materials are delivered to the storage areas and warehouses by conveyers and are handled with EKG-5 excavators).
机译:西西伯利亚冶金联合公司(ZSMK)的烧结石灰部门包括破碎分选厂,烧结厂,泵送/污泥处理设施以及石灰石煅烧车间。破碎分选设备旨在接收,平均并向煅烧车间,烧结厂和高炉输送装料。粉碎分选厂的第一阶段于1964年6月投入生产。该厂包括两个VRS-93自卸车,一个材料配送大楼(MDB),三个封闭式浓缩仓库,每个仓库的设计能力为97000 m,两个开放式存储区,设计容量分别为40000 m和10000 m,输送系统包括两个单元,将精矿与石灰混合,并接收用于燃料和水垢的料斗。开放式存储区分别用于石灰石和高炉装料(材料通过输送机输送到存储区和仓库,并由EKG-5挖掘机处理)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号