A sediment budget for the southern reach in San Francisco Bay, CA: Implications for habitat restoration

机译:加利福尼亚旧金山湾南部河段的沉积物预算:对栖息地恢复的影响

获取原文
获取原文并翻译 | 示例
           

摘要

The South Bay Salt Pond Restoration Project is overseeing the restoration of about 6000 ha of former commercial salt-evaporation ponds to tidal marsh and managed wetlands in the southern reach of San Francisco Bay (SFB). Asa result of regional groundwater overdrafts prior to the 1970s, parts of the project area have subsided below sea-level and will require between 29 and 45 million m~3 of sediment to raise the surface of the subsided areas to elevations appropriate for tidal marsh colonization and development Therefore, a sufficient sediment supply to the far south SFB subembayment is a critical variable for achieving restoration goals. Although both major tributaries to far south SFB have been seasonally gaged for sediment since 2004, the sediment flux at the Dumbarton Narrows, the bayward boundary of far south SFB, has not been quantified until recently. Using daily suspended-sediment flux data from the gages on Guadalupe River and Coyote Creek, combined with continuous suspended-sediment flux data at Dumbarton Narrows, we computed a sediment budget for far south SFB during Water Years 2009-2011. A Monte Carlo approach was used to quantify the uncertainty of the flux estimates. The sediment flux past Dumbarton Narrows from the north dominates the input to the subembayment However, environmental conditions in the spring can dramatically influence the direction of springtime flux, which appears to be a dominant influence on the net annual flux. It is estimated that up to several millennia may be required for natural tributary sediments to fill the accommodation space of the subsided former salt ponds, whereas supply from the rest of the bay could fill the space in several centuries. Uncertainty in the measurement of sediment flux is large, in part because small suspended-sediment concentration differences between flood and ebb tides can lead to large differences in total mass exchange. Using Monte Carlo simulations to estimate the random error associated with this uncertainty provides a more statistically rigorous method of quantifying this uncertainty than the more typical "sum of errors" approach. The results of this study reinforce the need for measurement of estuarine sediment fluxes over multiple years (multiple hydrologic conditions) to adequately detail the variability in flux. Additionally, the timing of breaching events for the restoration project could be tied to annual hydrologic conditions to capitalize on increased regional sediment supply.
机译:南湾盐池修复项目正在监督将约6000公顷的前商业盐蒸发池恢复到旧金山湾(SFB)南部的潮汐沼泽和受管理的湿地。由于1970年代之前区域性地下水的透支,项目区域的某些部分已经在海平面以下平息,并且将需要29至4500万立方米的沉积物才能将平陷区域的表面提高到适合潮汐沼泽定植的高度。与发展因此,向南SFB子湾提供足够的沉积物是实现恢复目标的关键变量。尽管自2004年以来,偏南SFB的两个主要支流都已按季节进行了沉积物测量,但直到最近才对偏南SFB的Bayward边界Dumbarton Narrows的泥沙通量进行了量化。利用瓜达卢佩河和郊狼溪的水位计的每日悬浮泥沙流量数据,再加上Dumbarton Narrows的连续悬浮泥沙流量数据,我们计算了2009-2011水年期间南偏南SFB的泥沙预算。蒙特卡罗方法用于量化通量估计的不确定性。从北部经过Dumbarton Narrows的泥沙通量支配着子堤防的输入,但是,春季的环境条件会极大地影响春季通量的方向,这似乎是净年通量的主要影响因素。据估计,天然支流沉积物可能需要多达几千年的时间才能填满已陷落的前盐池的居住空间,而海湾其他地区的供应则可能需要几个世纪的时间。泥沙通量的测量不确定性很大,部分原因是洪水和退潮之间的悬浮泥沙浓度差异小会导致总质量交换的差异大。与更典型的“误差总和”方法相比,使用蒙特卡洛模拟来估计与此不确定性相关的随机误差提供了一种更加统计上更加严格的量化此不确定性的方法。这项研究的结果加强了对多年(多种水文条件)河口沉积物通量的测量的需要,以充分详细说明通量的变化。此外,恢复项目破坏事件的时间可以与年度水文状况联系起来,以利用增加的区域沉积物供应。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号