首页> 外文期刊>Canadian Journal of Forest Research >Optimizing cable harvesting layout when using variable-length cable roads in central Europe
【24h】

Optimizing cable harvesting layout when using variable-length cable roads in central Europe

机译:在中欧使用可变长度的电缆路时,优化电缆收割的布局

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

One of the classic operations problems in forest management is the layout of a harvesting system. This paper addresses the design of a harvesting system in areas characterized by steep slopes requiring cable-based harvesting. Layout optimization often involves numerous potential cable alignments and a small number of potential landings. In this paper we develop a model that addresses steep slope conditions found in central Europe that involve a large number of potential landings and cable alignments. In addition we extend existing work by considering variable-length alternatives for each feasible cable alignment. We construct three models, one for single-length cable options and two for variable-length alternatives and test their efficacy in solving 18 different harvesting area problems. We show that one of the variable-length alternative models can be solved in computer times that are competitive with the single-length option model. Overall, the savings that can be attributed to variable-length options are modest, but the alignments found by the variable-length options models are more realistic from forest engineers' points of view, which will aid in its use and adoption
机译:森林管理中的经典操作问题之一是采伐系统的布局。本文介绍了在陡坡地区需要电缆收割的地区的收割系统设计。布局优化通常涉及许多潜在的电缆对准和少量的潜在着陆。在本文中,我们开发了一个模型,用于解决在中欧发现的涉及大量潜在着陆和电缆对准的陡坡条件。此外,我们通过考虑每种可行的电缆对齐方式的可变长度替代方案来扩展现有工作。我们构建了三个模型,一个模型用于单长度电缆选件,另外两个模型用于可变长度电缆选件,并测试它们在解决18种不同的收割面积问题上的功效。我们表明,可变长度替代模型之一可以在与单长度期权模型竞争的计算机时间内解决。总体而言,可归因于可变长度选项的节省是适度的,但是从森林工程师的角度来看,可变长度选项模型发现的对齐方式更为现实,这将有助于其使用和采用

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号