首页> 外文期刊>Machinery >Stringer machining fixed up: a more than £7 million investment at Airbus UK's Broughton site has resulted in a state-of-the-art production facility for A380 stringer machining
【24h】

Stringer machining fixed up: a more than £7 million investment at Airbus UK's Broughton site has resulted in a state-of-the-art production facility for A380 stringer machining

机译:固定纵梁加工:在英国空中客车公司的布劳顿工厂投资超过700万英镑,建立了最先进的A380纵梁加工生产设备

获取原文
获取原文并翻译 | 示例
           

摘要

Inside the box-like, grey-clad stringer manufacturing building at Airbus UK's Broughton site in North Wales, there is a smaller grey box that is part of a £7 million-plus investment for stringer machining. It represents state-of-the-art stringer production efficiency and brings together a DS Technologic Ecoliner 5-axis horizontal machining centre (with a 24 m x-axis) and novel Roemheld fixturing designed by Fraunhofer Institute of Production Technology at Aachen University, Germany. These support a single set-up, two-operation process that has slashed machining times by some 40 per cent over previous methods.
机译:在空客英国公司位于北威尔士的布劳顿工厂的盒子状,灰色覆层纵梁制造大楼内,有一个较小的灰色盒子,这是对纵梁加工投资700万英镑以上的一部分。它代表了最先进的纵梁生产效率,并结合了DS Technologic Ecoliner 5轴卧式加工中心(x轴为24 m)和德国亚琛大学弗劳恩霍夫生产技术学院设计的新型Roemheld夹具。 。它们支持一次设置,两次操作的过程,与以前的方法相比,加工时间缩短了约40%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号