Installation of a further form, fill and seal line was required to deal with the increasing demand for portion packs. Furthermore, production sequencing had to be synchronized between the machine line used so far and the new line. The product flow dir ection of the new machine at GOBBER had to be the same like that of the previous machine. One operator should be able to handle both machines at the same time, Discharge direction of the portion packs packed in boxes must be to be the same for both machi nes.
展开▼