Kawerau and Nga Awa Purua Geothermal Power Station Projects, New Zealand

机译:新西兰Kawerau和Nga Awa Purua地热发电站项目

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Mighty River Power's nominal 90 MW Kawerau Geothermal Power Station has been the largest geothermal project in New Zealand for more than 20 years. Fuji Electric has played a major role in this project for which Sumitomo Corporation was the turnkey EPC Contractor. Fuji Electric has engineered and manufactured principal equipment such as the steam turbine, generator, condenser, MV & LV electrical switchgear, etc., procured balance of plant equipment and materials, supervised construction and commissioned the project. The project has successfully satisfied its contractual performance criteria, construction work and commissioning have achieved the required quality standards, and the plant was put into commercial operation on August 30, 2008, more than one month ahead of contractual time limit. Success of the Kawerau project has led Fuji Electric to work on a next project, the 132 MW Nga Awa Purua Geothermal Power Station at Rotokawa, New Zealand, where construction is underway and commercial operation is expected to start in 2010. The Nga Awa Purua Geothermal Power Station is a joint venture between Mighty River Power and the Tanhara North No.2 Trust. This paper introduces and presents an overview of the Kawerau and Nga Awa Purua geothermal projects, technical features of the plant systems and components, and our experiences in supervising the construction and commissioning the projects. Technical features of the plant systems are divided into the Steam Separation System (SSS) which separates and produces purified steam from geothermal two-phase fluid, and the Power Generation Facility (PGF) which converts steam energy to electricity, as in boiler-based steam power plants.
机译:20多年来,Mighty River Power标称的90 MW Kawerau地热发电站一直是新西兰最大的地热发电项目。富士电机在该项目中发挥了重要作用,住友公司是该项目的总承包EPC承包商。富士电机设计并制造了主要设备,例如蒸汽轮机,发电机,冷凝器,中,低压电气开关设备等,获得了工厂设备和材料的平衡,监督了施工并调试了该项目。该项目已成功满足合同绩效标准,施工和调试均达到了所需的质量标准,该工厂于2008年8月30日投入商业运营,比合同期限提前了一个多月。 Kawerau项目的成功使富士电机开展了下一个项目,即新西兰Rotokawa的132 MW Nga Awa Purua地热电站,该项目正在进行建设,预计将于2010年开始商业运营。Nga Awa Purua地热电站电站是威河电力公司和丹哈拉北部第二信托基金之间的合资企业。本文介绍并介绍了Kawerau和Nga Awa Purua地热项目的概况,电厂系统和组件的技术特点,以及我们在监督建设和调试项目方面的经验。工厂系统的技术特征分为蒸汽分离系统(SSS)和发电设备(PGF),该设备从地热两相流体中分离并产生纯净蒸汽,而该设备将蒸汽能转化为电能,如锅炉蒸汽发电厂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号