首页> 外文期刊>Foster Natural Gas Report >Trailblazer, Frustrated by Shippers’ Targeting Its Crediting Practices in Context of Housekeeping Filing, Urged FERC to “Discipline” the Process; the Commission Declined
【24h】

Trailblazer, Frustrated by Shippers’ Targeting Its Crediting Practices in Context of Housekeeping Filing, Urged FERC to “Discipline” the Process; the Commission Declined

机译:开拓者对托运人在家政备案方面针对其信贷实践的做法感到沮丧,敦促FERC“纪律”这一程序;委员会被拒绝

获取原文
获取原文并翻译 | 示例
           

摘要

Trailblazer Pipeline Co. LLC (RP13-376) recently took a turn blasting yet another protest filed last month by Indicated Shippers who claim that Trailblazer’s indemnification waiver and force majeure provisions do not comply with FERC policy. FERC agreed with the shippers and ordered changes in an order issued Wednesday. According to Trailblazer, Indicated Shippers protested its housekeeping filing on grounds that are wholly unrelated to the changes proposed. Indicated Shippers’ “tactic”, holding up an administrative filing in order to extract concessions on unrelated matters, should not be condoned by the Commission. Trailblazer urged the Commission “to discipline its process so that minor administrative changes, such as those proposed here, can proceed without interference.”
机译:Trailblazer Pipeline Co. LLC(RP13-376)最近转而爆炸,这是Indicated Shippers上个月提起的另一次抗议,后者声称Trailblazer的赔偿免除和不可抗力条款不符合FERC政策。 FERC同意托运人的要求,并下令对周三发布的订单进行更改。据开拓者称,指示托运人以其与拟议变更完全无关的理由抗议其内务备案。委员会不应容忍指示托运人的“策略”,即保留行政文件以求取与无关事项有关的优惠。开拓者敦促委员会“对程序进行纪律,以便可以在不进行干预的情况下进行轻微的行政更改(例如此处建议的更改)。”

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号