Hess Corp. Poses Some New Arguments Challenging FERC’s Reservation Charge Crediting Policy As It Applies to PHMSA-Caused Outages

机译:赫斯(Hess Corp.)提出了一些新论点,对适用于PHMSA造成的停运的FERC的预订费用抵免政策提出了挑战

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Hess Corp. has requested rehearing of FERC’s May 30 order that conditionally accepted the filing of Portland Natural Gas Transmission System (PNGTS) (RP13-875) to revise its Reservation Charge Reimbursement provision in its tariff. Hess urged the Commission to modify the May 30 order to require PNGTS to provide full reservation charge credits for any failure to provide firm service if that failure is attributed to any order issued by the Pipeline and Hazardous Materials Safety Administration (PHMSA). The Commission applied its customary policy to allow modification of its full crediting mandate for a two-year interim period commencing 6/1/13, the proposed effective date of the filing. At a minimum, if the Commission will not require full credits, Hess argued that the Commission should require PNGTS to provide credits based on the “No Profit” method.
机译:赫斯公司(Hess Corp.)已要求对FERC的5月30日的命令进行预审,该命令有条件地接受了波特兰天然气传输系统(PNGTS)(RP13-875)的申请,以修改其关税中的“保留费用报销”条款。赫斯敦促委员会修改5月30日的命令,要求PNGTS对未能提供确定服务的任何失败提供全额保留费用抵免,前提是该失败归因于管道和有害物质安全管理局(PHMSA)发出的任何命令。委员会采用了其惯用政策,以允许在从6/1/13(申请的拟议生效日期)开始的两年过渡期内修改其全部贷记任务。至少,如果委员会不要求全额抵免,Hess认为委员会应要求PNGTS根据“无利润”方法提供抵免。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号