TUSCARORA GAS ASKS FERC TO REJECT PUBLIC UTILITIES COMMISSION OF NEVADA's AND SIERRA PACIFIC POWER CO.'S REQUEST FOR INTERIM RATE RELIEF

机译:TUSCARORA天然气公司要求拒绝NEVADA和SIERRA PACIFIC POWER CO。提出的临时利率减免委员会

获取原文
获取原文并翻译 | 示例
           

摘要

On 9/1/11, Tuscarora Gas Transmission Co. replied to the comments(RP11-1823, et al) on its cost and revenue studies and asked FERC to deny the requested interim rate relief filed by the Public Utilities Commission of Nevada (PUCN) and Sierra Pacific Power Co. d/b/a NV Energy (collectively, “complainants”). Tuscarora maintains that FERC “lacks authority” to provide the relief since the Commission may only issue an interim rate order under section 5 of the Natural Gas Act (NGA), “after it has conducted an adversarial, adjudicative- type hearing.” Thus far, Tuscarora has filed cost and revenue studies which demonstrate that, when appropriate adjustments are incorporated, its existing rates are in fact lower than is warranted. Moreover, complainants have yet to demonstrate that (1) Tuscarora's existing rates are unjust and unreasonable, and (2) the complainants? proposed rates are just and reasonable.
机译:2011年9月1日,Tuscarora Gas Transmission Co.回复了其有关成本和收入研究的评论(RP11-1823等),并要求FERC拒绝内华达州公用事业委员会(PUCN)提出的临时减税要求。 )和Sierra Pacific Power Co. d / b / a NV Energy(统称为“投诉人”)。 Tuscarora坚持认为,FERC“没有权力”提供救济,因为委员会只有在“进行了对抗性,裁决性听证之后,才可根据《天然气法》(NGA)第5条发布临时利率命令。”到目前为止,Tuscarora已提交了成本和收入研究,这些研究表明,如果进行适当的调整,则其现有税率实际上低于保证的税率。而且,申诉人尚未证明(1)Tuscarora的现行税率是不公正和不合理的,以及(2)申诉人?建议的费率是合理的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号