GULF LNG PIPELINE REQUESTS AUTHORIZATION TO INSTALL INTERCONNECTION SUPPORTING THE PASCAGOULA EXPANSION PURSUED JOINTLY BY FLORIDA GAS AND TRANSCO

机译:海湾液化天然气管道要求获得授权以建立互连,以支持由佛罗里达州天然气和运输公司共同购买的帕斯卡古拉膨胀

获取原文
获取原文并翻译 | 示例
           

摘要

Gulf LNG Pipeline (GLNG), LLC (CP06-486) on 5/18/11 requested FERC's authorization to construct, own, and operate, under its blanket certificate, an interconnection with Transcontinental Gas Pipe Line, LLC (Transco) and Florida Gas Transmission Co. (FGT) at their Pascagoula Expansion Project in order for Transco and FGT to receive the gas stream that will be comprised of re-vaporized liquefied natural gas (LNG). GLNG Pipeline intends to construct 120 feet of 24-inch diameter pipeline and certain check measurement equipment for the new interconnection at the terminus of the Pascagoula project in Jackson County, Mississippi. GLNG Pipeline was created to operate and maintain the 5.02 mile long, 36-inch diameter sendout pipeline of the LNG Clean Energy Project, authorized in February 2007. The pipeline will be operated on a proprietary and integrated basis with the affiliated LNG terminal. The cost of GLNG Pipeline's interconnection is estimated to be $245,000 and will allow GLNG Pipeline to deliver and Transco and FGT to receive up to 810,000 dth/d firm transportation service. There will be no change in GLNG Pipeline's daily design capacity or daily operating pressure.
机译:墨西哥湾LNG管道(GLNG),LLC(CP06-486)于5/18/11要求FERC授权以其一揽子证书建造,拥有和运营与Transcontinental Gas Pipeline,LLC(Transco)和Florida Gas的互连传输公司(FGT)在其Pascagoula扩建项目中,以便Transco和FGT接收将由再蒸发的液化天然气(LNG)组成的气流。 GLNG管道计划在密西西比州杰克逊县Pascagoula项目的终点建造120英尺长的24英寸直径管道和某些支票测量设备,用于新的互连。 GLNG管道的创建是为了运营和维护LNG清洁能源项目的5.02英里长,直径为36英寸的出口管道,该管道已于2007年2月获得授权。该管道将与相关的LNG终端在专有和集成的基础上运行。 GLNG Pipeline的互连成本估计为$ 245,000,这将使GLNG Pipeline能够交付,Transco和FGT每天最多可接收810,000 d公司固定运输服务。 GLNG Pipeline的每日设计能力或每日操作压力将保持不变。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号