...
首页> 外文期刊>Foster Natural Gas Report >NV ENERGY AND NEVADA REGULATORS URGE FERC TO STICK WITH COST AND REVENUE STUDY DEMAND AND OTHER COMPLIANCE BURDENS IMPOSED ON TUSCARORA
【24h】

NV ENERGY AND NEVADA REGULATORS URGE FERC TO STICK WITH COST AND REVENUE STUDY DEMAND AND OTHER COMPLIANCE BURDENS IMPOSED ON TUSCARORA

机译:NV能源和内华达州监管机构敦促FERC坚持成本和收入研究需求以及施加于Tuscarora上的其他合规要求

获取原文
获取原文并翻译 | 示例

摘要

On 7/7/11, the Public Utilities Commission of Nevada (PUCN) and Sierra Pacific Power Co. d/b/a NV Energy submitted a joint answer to Tuscarora Gas Transmission Co.'s (RP11-1823) request for rehearing of the FERC order, setting Tuscarora's rates for hearing, issued on 6/24/11. PUCN/Sierra Pacific assert that FERC did not exceed Tuscarora's authority under the Natural Gas Act (NGA), nor did it act "arbitrarily or capriciously," when it instructed Tuscarora to file a cost and revenue study and to allow only limited adjustments for changes to Tuscarora projects.
机译:2011年7月7日,内华达州公用事业委员会(PUCN)和Sierra Pacific Power Co. d / b / a NV Energy对Tuscarora Gas Transmission Co.(RP11-1823)要求对FERC指令(于11年6月24日发布)设定了Tuscarora的听证率。 PUCN / Sierra Pacific断言,FERC在指示Tuscarora进行成本和收入研究并仅允许有限的调整调整时,未超出Tuscarora根据《天然气法》(NGA)的授权,也未“任意或反复无常”地行事。到Tuscarora项目。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号