...
首页> 外文期刊>Foster Natural Gas Report >COLUMBIA PIPELINES INSIST FORUMS NEXT MONTH WILL SOLVE NAVIGATES'SYSTEM PROBLEMS FASTER THAN A TECH CONFERENCE DEMANDED BY SHIPPERS
【24h】

COLUMBIA PIPELINES INSIST FORUMS NEXT MONTH WILL SOLVE NAVIGATES'SYSTEM PROBLEMS FASTER THAN A TECH CONFERENCE DEMANDED BY SHIPPERS

机译:哥伦比亚管道将在下个月举行的论坛上解决航海家的系统问题,而不是由运输商要求的技术会议

获取原文
获取原文并翻译 | 示例

摘要

Columbia Gulf Transmission Co.(RP09-141)and Columbia Gas Transmission,LLC(RP09-142)(the Columbia Pipelines)together disparaged recent motions filed by the Indicated Shippers,the New York State Electric & Gas Corp.(NYSEG)and Sequent Energy Management,LP opposing the Columbia Pipelines'request to withdraw the proposed Rate Schedule SVS(Scheduling Variance Service)and demanding a technical conference.While sympathizing with shippers'frustrations,the pipeline companies answered the protestors'concerns regarding Navigates,saying the Columbia Pipelines'new Electronic Bulletin Board(EBB)has nothing to do with the proposed Rate Schedule SVS."Indeed,the protestors recognize that issues set for technical conference do not relate at all to the merits of Rate Schedule SVS,demonstrating that this proceeding is not the proper forum in which to address the implementation of Navigates."
机译:哥伦比亚海湾输电公司(RP09-141)和哥伦比亚天然气输电公司(LLC(RP09-142))(哥伦比亚管道)共同驳斥了指示托运人,纽约州电力与天然气公司(NYSEG)和Sequent的近期动议。能源管理公司(Energy Management,LP)反对哥伦比亚管道公司撤回拟议的费率表SVS(计划偏差服务)并要求召开一次技术会议。在同情托运人的挫败感时,管道公司回答了抗议者对航行的担忧,称哥伦比亚管道公司“新的电子公告板(EBB)与建议的费率表SVS无关。”实际上,抗议者认识到为技术会议设置的问题与费率表SVS的优劣根本不相关,这表明该程序与解决导航实施问题的适当论坛。”

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号