...
首页> 外文期刊>Foster Natural Gas Report >Bison Pipeline Seeks to Reassure Shipper on Various Tariff Changes; Acknowledges Error - Greenhouse Gas Surcharge is Premature
【24h】

Bison Pipeline Seeks to Reassure Shipper on Various Tariff Changes; Acknowledges Error - Greenhouse Gas Surcharge is Premature

机译:野牛管道公司试图使托运人对各种关税变化感到放心;确认错误-温室气体附加费过早

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Bison Pipeline LLC (CP09-161) recently answered comments by Minnesota Energy Resources Corp. (MERC) on its application to build a 302-mile system with capacity of 477 MMcf/d from Wyoming to North Dakota. The route extends northeastward from the Dead Horse region near Gillette across the southeastern corner of Montana into southwestern North Dakota. At that point, in Morton County, Bison would interconnect with Northern Border Pipeline.
机译:Bison Pipeline LLC(CP09-161)最近回答了明尼苏达州能源资源公司(MERC)关于其从怀俄明州到北达科他州的建造302英里容量为477 MMcf / d的系统的应用的评论。这条路线从吉列附近的死马地区向东北延伸,穿过蒙大拿州的东南角,到达西北达科他州。到那时,在莫顿县,野牛将与北部边境管道互连。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号