...
首页> 外文期刊>Foster Natural Gas Report >Many Tariff changes in southern Natural's Rate Case still Disputed; Notification Time Frame for Right-of-First-Refusal (ROFR) Conflicts with Current Policy; ROFR Bidders Should Not Have to Match Bids for Expansion Service
【24h】

Many Tariff changes in southern Natural's Rate Case still Disputed; Notification Time Frame for Right-of-First-Refusal (ROFR) Conflicts with Current Policy; ROFR Bidders Should Not Have to Match Bids for Expansion Service

机译:南部自然税率案中许多关税变化仍存在争议;优先权与当前政策冲突的通知时间表; ROFR投标人不必与扩展服务的投标相匹配

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Southern Natural Gas Co. (RP09-427) is not nearly out of the woods with respect to revised tariff sheets filed along with its general rate case - and further revised after a FERC staff technical conference. Background. Southern filed its case with FERC on March 2, prompting a slew of protests on March 16. One week later, Southern submitted a comprehensive rebuttal and agreed that some tariff issues can be resolved through a technical conference. Southern argued, in particular, that it needs timely consideration of its proposed tracker mechanisms as alternatives to traditional ratemaking. An April 1 FERC order suspended the filing for the maximum five months (through September 1), subject to the outcome of a technical conference and a hearing.
机译:南方天然气公司(RP09-427)连同其一般费率表一起提交的修订后的电价表几乎未走出困境-并在FERC员工技术会议后进一步修订。背景。南方航空公司于3月2日向FERC提起了诉讼,引发了3月16日的一系列抗议活动。一周后,南方航空公司提出了全面反驳,并同意可以通过技术会议解决某些关税问题。南方航空公司特别指出,它需要及时考虑其提议的跟踪器机制,以替代传统的费率制定。根据技术会议和听证会的结果,FERC于4月1日发布的命令将申请暂停了最长五个月(至9月1日)。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号