...
首页> 外文期刊>Foster Natural Gas Report >FERC ACCEPTS COMPLIANCE FILING IN EL PASO'S GENERAL RATE CASE;EL PASO ANSWERS SHIPPERS ON POST-CONFERENCE ORDER;INFORMAL SETTLEMENT CONFERENCE IS SCHEDULED
【24h】

FERC ACCEPTS COMPLIANCE FILING IN EL PASO'S GENERAL RATE CASE;EL PASO ANSWERS SHIPPERS ON POST-CONFERENCE ORDER;INFORMAL SETTLEMENT CONFERENCE IS SCHEDULED

机译:埃尔帕索(ER PASO)一般费率情况下的FERC接受合规备案;会议后订购时埃尔帕索(EL PASO)回答运输人的问题;安排了非结算会议

获取原文
获取原文并翻译 | 示例
           

摘要

The Commission will convene an informal settlement conference next week on March 11-12 in the pending general rate case filed by El Paso Natural Gas Co.(EPNG)(RP08-426)under Section 4 of the Natural Gas Act(NGA).The pipeline's last general rate case(RP05-422)-its first in 10 years-was settled in December 2006 and approved by FERC in August 2007.The rates established at that time terminated on 12/31/08.
机译:委员会将在下周3月11日至12日召开一次非正式和解会议,讨论由El Paso天然气公司(EPNG)(RP08-426)根据《天然气法》(NGA)第4节提交的未决一般价格案。管道的最后一个一般费率案例(RP05-422)-十年来第一次-已于2006年12月解决,并于FERC于2007年8月批准。当时确定的费率于12/31/08终止。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号