首页> 外文期刊>Foster Natural Gas Report >ALASKA PULLS THE PLUG ON POINT THOMSON UNIT,SAYS NORTH SLOPE PRODUCERS HAVE'EXHAUSTED ITS PATIENCE'IN THEIR REPEATED FAILURE TO DEVELOP ABUNDANT RESOURCES
【24h】

ALASKA PULLS THE PLUG ON POINT THOMSON UNIT,SAYS NORTH SLOPE PRODUCERS HAVE'EXHAUSTED ITS PATIENCE'IN THEIR REPEATED FAILURE TO DEVELOP ABUNDANT RESOURCES

机译:阿拉斯加将塞子放在汤姆森单位上,说北坡生产者在不断失败以开发大量资源方面“已经失去了耐心”

获取原文
获取原文并翻译 | 示例
       

摘要

On 4/22/08 Alaska's Department of Natural Resources(DNR)Commissioner Tom Irwin rejected the 23rd Plan of Development and Operations(POD)submitted by ExxonMobil,BP,Chevron,ConocoPhillips and numerous working interest owners(WIOs)and terminated the Point Thomson Unit(PTU)and PTU Agreement(PTUA).The unit-a gas and condensate field on the North Slope of Alaska formed in 1977-is the structure that combined all lease holdings for purposes of potential development.With approximately 8 Tcf of gas and 200 million barrels of condensate,it is the second-largest gas field on the North Slope after Prudhoe Bay,but no oil or gas resources have been produced.
机译:2008年4月22日,阿拉斯加自然资源部专员汤姆·欧文(Tom Irwin)拒绝了埃克森美孚,BP,雪佛龙,康菲石油公司和许多工作权益持有人(WIO)提交的第23个发展与运营计划(POD),并终止了汤姆森角单位(PTU)和PTU协议(PTUA)。单位(阿拉斯加北坡的天然气和凝析气田于1977年形成)是一种结合了所有租赁物用于潜在开发目的的结构。天然气和天然气的总凝结量约为8 Tcf。 2亿桶凝析油,是北坡上仅次于普拉德霍湾的第二大天然气田,但尚未生产任何石油或天然气资源。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号