...
首页> 外文期刊>Foster Natural Gas Report >Colorado Interstate's High Plains Expansion Project Is Conditionally Approved; FERC Will Investigate the Pipeline's Long-Standing Collection of Unauthorized Overrun Penalty During Non-Critical Periods
【24h】

Colorado Interstate's High Plains Expansion Project Is Conditionally Approved; FERC Will Investigate the Pipeline's Long-Standing Collection of Unauthorized Overrun Penalty During Non-Critical Periods

机译:科罗拉多州际公路公司的高平原扩展项目已获得有条件的批准; FERC将调查非关键时期管道的长期未授权超支罚款

获取原文
获取原文并翻译 | 示例

摘要

By order issued 3/21/08, FERC conditionally granted Colorado Interstate Gas Co. (CIG) (CP07-207) a certificate to construct and operate approximately 164 miles of pipeline and appurtenant facilities in Adams, Morgan, and Weld Counties, Colo, dubbed the High Plains Expansion Project. The natural gas project will enable CIG to transport 899,000 dth/d. However, in the same comprehensive order the Commission initiated an investigation under Section 5 of the Natural Gas Act (NGA) (RP08-190) and instructed CIG to show cause why its existing tariff provisions related to the unauthorized overrun rate during non-critical periods are just and reasonable and comport with policy.
机译:根据2008年3月21日发布的命令,FERC有条件地授予了科罗拉多州际气体公司(CIG)(CP07-207)证书,该证书可以在科罗拉多州亚当斯,摩根和威尔德县建设和运营约164英里的管道及附属设施。被称为高原开发项目。天然气项目将使CIG每天输送899,000 dth。但是,按照同一综合性命令,欧盟委员会根据《天然气法》(NGA)(RP08-190)第5节的规定展开了调查,并指示CIG说明原因,为什么其现有的电费规定与非关键时期的未经授权超支率有关公正合理,符合政策规定。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号