...
首页> 外文期刊>Foster Natural Gas Report >PERC Allows Kern River to Withdraw Tariff Change on Material Deviations; Reaffirms That Reservation Charge Credits, Except for Individually Negotiated Contracts, Are Mandatory
【24h】

PERC Allows Kern River to Withdraw Tariff Change on Material Deviations; Reaffirms That Reservation Charge Credits, Except for Individually Negotiated Contracts, Are Mandatory

机译:PERC允许Kern River撤回因材料偏差产生的关税变化;重申除个人谈判合同外,预订收费积分是强制性的

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

FERC on 8/6/10 granted in part, and denied in part, a request for rehearing by Kem River Gas Transmission Co. (RP10-160) and granted clarification of a December 2009 order conditionally accepting certain tariff changes, subject to conditions. Kern River had originally filed in November 2009 to revise the general terms and conditions of its tariff to address cases where FERC decides that a contract provision is an impermissible material deviation. Although there was nothing in the November 2009 filing about reservation charge credits, the latest order also addressed that issue on the grounds that consideration is not limited to a general rate case, as claimed by Kern River.
机译:FERC于10年8月6日获得部分批准,但被部分拒绝,由Kem River Gas Transmission Co.(RP10-160)进行排练请求,并澄清了2009年12月的命令,该命令有条件地接受某些电价变化,但要视情况而定。 Kern River最初于2009年11月提交申请,以修改其关税的一般条款和条件,以解决FERC认为合同规定是不允许的重大偏差的情况。尽管2009年11月的文件中没有关于保留费用抵免额的最新信息,但最新的命令也解决了该问题,其理由是,对价不仅仅限于一般利率案件,正如科恩·里弗(Kern River)所说。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号