首页> 外文期刊>Foster Natural Gas Report >Texas Gas Abandons Abandonment After Failure To Realize Sufficient Support for the Bluegrass NGL Pipeline Project
【24h】

Texas Gas Abandons Abandonment After Failure To Realize Sufficient Support for the Bluegrass NGL Pipeline Project

机译:未能为Bluegrass NGL管道项目提供充分支持后,得克萨斯天然气公司放弃了弃工

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Texas Gas Transmission, LLC (CP13-485) on June 3 filed with FERC a Notice of Withdrawal to withdraw its abbreviated application for authorization to abandon considerable mainline facilities filed on May 29 last year. It had requested authorization to abandon approximately 568 miles of certain looped segments of its mainline pipeline from Eunice, Louisiana to Hardinsburg, Kentucky and associated facilities. Texas Gas intended to abandon the facilities in place and ultimately transfer the facilities such that they would be repurposed for natural gas liquids (NGL) transportation and used as part of the significantly larger Bluegrass Pipeline Project that was planned to transport NGLs from the Marcellus and Utica Shale production areas to Louisiana for processing.
机译:Texas Gas Transmission,LLC(CP13-485)于6月3日向FERC提交了一份撤回通知,以撤回其简短的许可申请,以放弃去年5月29日提交的大量主干设施。它已请求批准放弃从路易斯安那州的尤尼斯(Eunice)到肯塔基州的哈丁斯堡(Hardinsburg)和相关设施的约568英里干线某些环形路段。德州天然气(Texas Gas)打算放弃现有设施,并最终转移这些设施,以便将它们重新用于天然气液(NGL)运输,并用作计划从马塞勒斯(Marcellus)和尤蒂卡(Utica)运输NGL的更大的蓝草管道项目的一部分页岩生产地区到路易斯安那州进行加工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号