首页> 外文期刊>Foster Natural Gas Report >Columbia Gulf Defends Both Primary Rates and Prospective, Preferred Rate Design Proposals after its Section 4 Filing at FERC Draws Substantial Number of Protests
【24h】

Columbia Gulf Defends Both Primary Rates and Prospective, Preferred Rate Design Proposals after its Section 4 Filing at FERC Draws Substantial Number of Protests

机译:哥伦比亚湾在FERC的第4节备案中吸引了大量抗议活动后,为主要利率和有前瞻性的首选利率设计提案提供了辩护

获取原文
获取原文并翻译 | 示例
           

摘要

Columbia Gulf Transmission Co. (RP11-1435) defended its rate and tariff case filed at FERC pursuant to section 4 of the Natural Gas Act (NGA) at the end of October after a slew of protests and comments challenged the premises of some of the pipeline company's calculations and proposals. The pipeline urged the Commission to accept, suspend and set for hearing, subject to refund, the Primary Rates and to include in any hearing the Preferred Rates for which prospective effect is requested. Although Columbia Gulf disagrees with protestors' characterizations and allegations regarding its rate and tariff revisions, Columbia Gulf agrees that rate issues are best addressed in an evidentiary hearing and that specific questions raised regarding the non-rate tariff changes are best resolved in a technical conference.
机译:哥伦比亚海湾输电公司(RP11-1435)于10月底根据一系列《天然气法》(NGA)第4条向联邦能源管理委员会(FERC)提交了其费率和关税案的抗辩,此前发生了一系列抗议和评论,对其中一些房屋的房舍提出了质疑。管道公司的计算和建议。该管道敦促委员会接受,暂停和安排听证会,但要退还基本费率,并在听证会中包括要求有预期影响的优先费率。尽管哥伦比亚湾不同意抗议者对其费率和关税税率修改的描述和指控,但哥伦比亚湾同意在证词听证会上可以最好地解决费率问题,并且在一次技术会议上可以最好地解决有关非费率税率变化的具体问题。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号