...
首页> 外文期刊>Foster Natural Gas Report >Let the Market Decide the Feasibility of Waste Heat Power Generation by Gas Pipeline Systems, Argues MidAmerican Energy Pipeline Group
【24h】

Let the Market Decide the Feasibility of Waste Heat Power Generation by Gas Pipeline Systems, Argues MidAmerican Energy Pipeline Group

机译:由市场决定天然气管道系统余热发电的可行性,MidAmerican Energy Pipeline Group

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The recent FERC Energy Efficiency of Natural Gas Infrastructure and Operations Conference (AD09-11) provided a forum for, among other industry representatives, Robert Checketts, vice president of operations, IT and engineering, at Kern River Gas Transmission Co., to explain to regulators why waste heat recovery operations may not be viable on many natural gas pipeline systems — low equipment utilization, high capital costs and low power prices. Checketts spoke at the conference last month on behalf of the MidAmerican Energy Pipeline Group, comprised of Kern River and Northern Natural Gas Co., regarding those two companies' efforts to initiate economically viable waste heat recovery projects.
机译:最近的FERC天然气基础设施和运营能源效率会议(AD09-11)为Kern River Gas Transmission Co.的运营,IT和工程副总裁Robert Checketts等行业代表提供了一个论坛,向他们解释。监管机构为何在许多天然气管道系统上不可行废热回收操作-设备利用率低,投资成本高和电价低。 Checketts上个月在会议上代表由Kern River和Northern Natural Gas Co.组成的MidAmerican Energy Pipeline Group发言,谈到了两家公司在经济上可行的废热回收项目方面的努力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号