...
首页> 外文期刊>Foster Natural Gas Report >In Turnabout, FERC Grants State of Alaska and Anadarko's Requests That TAPS End Life Be Part of the Issues Set for Hearing in Pending Rate Cases
【24h】

In Turnabout, FERC Grants State of Alaska and Anadarko's Requests That TAPS End Life Be Part of the Issues Set for Hearing in Pending Rate Cases

机译:在转折中,FERC授予阿拉斯加州和Anadarko的要求,将TAPS终止寿命纳入待决案件中的听证会

获取原文
获取原文并翻译 | 示例

摘要

On 12/10/09 FERC granted requests of The State of Alaska and Anadarko Petroleum Corp. for rehearing of the Commission's 4/29/09 order that, among other things, accepted and suspended, subject to refund, ExxonMobil Pipeline Co.'s 2009 tariff filing for Exxon's share of capacity on the Trans Alaska Pipeline System (TAPS) and established hearing procedures. (BP Pipelines (Alaska) Inc. et a/. (IS09-348 et a/.)) For several reasons, the Commission granted rehearing sought by Alaska and Anadarko on the end-life issue. This order also includes a clarification of the operation of the uniform rate policy. At one point Anadarko requested the Commission to clarify that the uniform rate constitutes a maximum rate for TAPS, but it does not obligate all Carriers to file for and charge the maximum rate. "We agree and clarify that the uniform rates will establish the maximum rate, but carriers may charge a lesser rate," this order stated.
机译:FERC于2009年12月10日批准了阿拉斯加州和Anadarko石油公司的要求,要求他们对委员会的4/29/09号命令进行复审,该命令除其他事项外被接受并中止(可退款),埃克森美孚管道公司埃克森美孚在跨阿拉斯加管道系统(TAPS)上的产能份额和已建立的听证程序的2009年关税文件。 (BP Pipelines(Alaska)Inc.等(IS09-348等)。)出于多种原因,委员会批准了Alaska和Anadarko在终生问题上进行的预审。该命令还包括统一费率政策的操作说明。 Anadarko曾一度要求委员会澄清统一费率是TAPS的最高费率,但并不要求所有承运人有义务申请并收取最高费率。该命令说:“我们同意并澄清统一费率将确定最高费率,但运营商可能会收取较低的费率。”

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号