首页> 外文期刊>Foundations and Trends in Technology, Information and Operations Management >6 Selecting a Portfolio of Projects Aligned with System-Level Goals
【24h】

6 Selecting a Portfolio of Projects Aligned with System-Level Goals

机译:6选择符合系统级目标的项目组合

获取原文
获取原文并翻译 | 示例
           

摘要

This section discusses the fourth component of our model, which is using a series of improvement projects to achieve gains. We also review the operations management literature on scheduling. We review this body of literature in this section because improving the utilization of resources, such as operating rooms or physicians' appointment slots, often requires a multi-faceted approach involving scheduling policies, patient behavior, and operating procedures.
机译:本节讨论模型的第四部分,该部分使用一系列改进项目来获得收益。我们还将回顾有关调度的运营管理文献。我们在本节中回顾此文献,因为要提高资源的利用率,例如手术室或医生的预约空位,通常需要采用多方面的方法,包括调度策略,患者行为和操作程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号