首页> 外文期刊>Fertilizer Week >Middle East & Africa : TUNISIA
【24h】

Middle East & Africa : TUNISIA

机译:中东和非洲:突尼斯

获取原文
获取原文并翻译 | 示例
           

摘要

GCT restarted phosphoric acid operations and one of its two DAP trains July 26 after phosphate rock mining again resumed. The Tunisian producer halted operations July 12 following strike action by port and rail workers. Prior to the latest wave of walkouts, GCT planned to produce around 55-65,000 mt of DAP (50-60% of capacity) in July. Production loss as a result of the outage is estimated at around 25,000 mt DAP against a total production for July projected earlier at 55,000 mt (50% of its designed capacity of 110,000 mt/month).
机译:GCT重新启动了磷矿开采后,GCT在7月26日重新启动了磷酸运行,并启动了其两列DAP列车之一。突尼斯生产商在港口和铁路工人罢工之后于7月12日停止运营。在最新一轮罢工浪潮之前,GCT计划在7月生产约55-65,000公吨的DAP(产能的50-60%)。停运造成的生产损失估计约为25,000公吨DAP,而7月份的总产量预计为55,000公吨(设计产能110,000公吨/月的50%)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号