首页> 外文期刊>Geografiska Annaler, Series A. Physical Geography >A suspended sediment budget of the Yichang-Wuhan reach of the Yangtze river, China
【24h】

A suspended sediment budget of the Yichang-Wuhan reach of the Yangtze river, China

机译:长江宜昌至武汉河段的悬浮泥沙预算

获取原文
获取原文并翻译 | 示例
           

摘要

The amount of the sediment deposition in the Yichan-Wuhan reach of the middle Yangtze River (also known as Changjiang River) has been determined using the concept of sediment budget at the channel-reach scale. The fill-scour processes of the middle Yangtze River were studied during the period 1956-1997 in response to the variation in sediment load and flow inputs. The results show that 13.3% of the net input of sediment was deposited in the studied river reach. Since 1956, the output sediment load of the studied reach increased with time to 1981, followed by a decline. The increase in output before 1981 can be related to the man-made bend neck-cutoff which caused a decrease in the sediment load diverted through the 'three outfalls' (i.e. the three distributaries from the Yangtze main stem to the Dongting Lake) and increased the sediment-carrying capacity of the river. Thereby, the river could transport more sediment to the outlet of the studied river reach. The decrease in the sediment load output after 1984 was directly due to the decreased sediment load at Yichang station. Multiple regression equations have been established to assess the contributions of influencing factors to the variation in sediment deposition amount in the studied river reach.
机译:长江中游地区(亦称长江)的宜昌至武汉河段的泥沙淤积量是根据河道规模的泥沙预算概念确定的。响应于泥沙负荷和流量输入的变化,研究了长江中游在1956-1997年期间的冲刷过程。结果表明,沉积物净输入量的13.3%沉积在所研究的河段。自1956年以来,所研究的河床的输沙量随时间增加,到1981年,然后下降。 1981年之前产量的增加可能与人为弯曲的颈部截流有关,后者导致通过“三个排污口”(即从长江主干到洞庭湖的三个分流点)转移的泥沙负荷减少。河流的泥沙输送能力。因此,河流可以将更多的泥沙输送到所研究的河流出口。 1984年以后输沙量的减少直接是由于宜昌站的输沙量减少。建立了多元回归方程,以评估影响因素对研究河段沉积物沉积量变化的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号