首页> 外文期刊>European Journal of Operational Research >A multicriteria heuristic method to improve resource allocation in multiproject scheduling
【24h】

A multicriteria heuristic method to improve resource allocation in multiproject scheduling

机译:在多项目调度中改善资源分配的多准则启发式方法

获取原文
获取原文并翻译 | 示例
           

摘要

Many works published in the area of project management make reference to the scheduling of single projects and time objectives like minimising project duration. Nevertheless, frequently companies manage various projects which share a pool of constrained resources, taking into account other objectives in addition to time. In order to add flexibility in using project scheduling tools. we have developed a multicriteria heuristic that improves lexicographicly two criteria: one time type - mean project delay or multiproject duration increase - and one no time type - project splitting, in-process inventory, resource levelling or idle resources - that can be chosen by the user. The multicriteria heuristic algorithm consists of several algorithms based on the improvement of multiproject feasible schedules. Through an extensive computational study, we have shown that this method improves the feasible multiproject schedule obtained from heuristic methods based on the priority rules coded Maximum Total Work Content (MAXTWK) and Minimum Latest Finish Time (MINLFT) as well as project management software - Microsoft Project, CA-SuperProject, Time Line and Project Scheduler.
机译:在项目管理领域出版的许多作品都参考了单个项目的计划和时间目标,例如最小化项目工期。但是,公司经常管理各种项目,这些项目共享有限的资源池,除了时间之外还要考虑其他目标。为了增加使用项目计划工具的灵活性。我们开发了一种多准则启发式方法,从字典上改进了两个标准:一种时间类型-平均项目延迟或多项目持续时间增加-一种非时间类型-项目拆分,过程中库存,资源均衡或闲置资源-可以由用户。多准则启发式算法由基于多项目可行进度表改进的几种算法组成。通过广泛的计算研究,我们表明该方法改进了从启发式方法获得的可行多项目进度表,该方法基于编码最大总工作内容(MAXTWK)和最小最新完成时间(MINLFT)的优先级规则以及项目管理软件-Microsoft项目,CA-SuperProject,时间轴和项目计划程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号